JUB II
A major refurbishment to Jub II was carried out early in 2016 consisting of a newly engineered and constructed pile frame, new hydraulic pumps and valves which are now computer operated and can be remotely controlled to operate all hydraulic functions on board. Other additions include a fully equipped tool shed and lunch room.
Taree
Early in 2017 a full refurbishment was carried out to our Deck Barge Taree. The beam was widened by 2 meters, new teflon line spud wells fabricated throughout the hull and new sponsons were installed. It was fully blasted and painted to complete the refurbishment.
Taurus
Our Tug boat ” Taurus” also underwent a refurbishment in early 2017. A new full hydraulic system including steering was installed, along with a 240v hydraulic generator, auto helm & interface to the hydraulic steering. Drive shafts and propellors were overhauled, and a full blast and paint carried out.
Diece-Telehandler
Newest Edition